Case studies

Site environment monitoring and equipment connectivity

A site that needs short-term networking for temporary power, dust or equipment status

  • Our role: Equipment and platform supply
  • Construction

The problem

Points are temporary and power/network unstable; dust, power or equipment status rely on walking the site, so regulators and the project office cannot align in time.

What we connected

  • On-site environment or power-status capture
  • 4G uplink and threshold notification

What we did

  • Deploy movable gateways and sensors by project phase, not as a permanent equipment room
  • Key thresholds reach the project office and duty phones
  • Gear can move to the next site at demobilisation

How it was rolled out

  1. Confirm regulatory requirements and what to capture (dust, power, on/off)
  2. Pilot on a 4G gateway; check false alarms and power
  3. Copy by works package and agree demobilisation recovery

Outcome

  • Temporary sites still produce reportable status
  • Thresholds reach the project office
  • Equipment can rotate with the job

If your site is similar

Send site duration, what to monitor (dust, power, equipment), and whether a regulator platform is mandatory.

Next step

If your site is similar

Send site duration, what to monitor (dust, power, equipment), and whether a regulator platform is mandatory.

Can this equipment be connected?

Three fields are enough. Leave a phone number; we reply within 4 working hours.

Add more detail