01

Power and Environment Monitoring

Unified monitoring of temperature, humidity, leaks, smoke, access control, UPS and switchgear so risks are found and handled in time.

Open the scenario

02

Energy Efficiency and Carbon Accounting

See how energy is used, manage abnormal consumption, and turn sub-metered data into a usable base for carbon accounting.

Open the scenario

Data center

Weinan New Energy Big Data Center

Our role: Equipment and platform supply · Delivered 2024

Delivered in 2024. About 11 above-ground floors with per-floor electricity meters; building water meters and park gas meters for monthly accounting; two underground parking levels with CO monitoring plus fan run, fault, remote and automatic control.

At Weinan New Energy Big Data Center, water, electricity and gas rely on master meters or scattered manual reads, so accounts only line up at month-end. Parking-garage CO and fans depend on on-site duty, so usage spikes, fan faults and poor ventilation surface late.

Open the case

A municipal water-utility headquarters

Energy metering and building control for a municipal water-utility headquarters

Our role: Equipment and platform supply · Delivered 2025

Delivered in 2025. About 12 floors plus the roof with per-floor electricity; live work, domestic and total water; park gas in the same monthly report; fresh-air units with status and remote control; underground garage environment trends.

Floor electricity, work and domestic water, and park gas are read separately, so accounts only line up at month-end. Fresh-air units need a site visit to see run and fault, and garage environment change has no continuous record.

Open the case

A key university in Henan

Metered billing and prohibited-load monitoring

Our role: Equipment and platform supply · Delivered 2024

Delivered in 2024. Four dormitory buildings — about 640 rooms — plus a dozen shops and one sports hall on one billing system; about 60 meters per gateway, with smart breakers for remote switching and load detection

Dorms, shops and the sports hall follow different electricity rules. Meter reading, top-up, month-end bills and cut-off on arrears are reconciled by hand. Prohibited high-power appliances share a circuit with air conditioning, so they are found late and hard to attribute.

Open the case

03

Smart Restroom

Environment, occupancy, consumables and facility status become visible, with traceable cleaning and exception handling.

Open the scenario

Municipal restrooms

Star-rated public restrooms in Tianhe, Guangzhou

Our role: Equipment and platform supply · Delivered 2020

Delivered in 2020. Tianhe's star-rated restrooms have occupancy sensing, flush-after-use, indicators, air quality, an entrance screen and fresh-air deodorising, plus automatic lighting, floor washing and drying.

Tianhe's restrooms are busy, so odour, wet floors and finding a free stall depend on cleaners watching. Sound-activated lights can go out while a stall is still occupied; missed flushes and unwashed floors mean complaints arrive before detection.

Open the case

Transport hub

Smart restrooms at Guangzhou Baiyun Airport terminal

Our role: Equipment and platform supply · Delivered 2023

Delivered in 2023. Terminal restrooms have stall sensing, door indicators and emergency call. About 52 smart paper dispensers and 8 smart soap dispensers watch remaining stock, and the platform also shows free stalls, air and footfall.

Baiyun Airport's terminal traffic is concentrated, so toilet paper and hand soap run out before stalls do. Cleaners refill on a fixed route, remaining stock is invisible, and passenger complaints arrive first.

Open the case

Scenic area / park

Smart restrooms at Xiezhou Guandi Temple, Yuncheng, Shanxi

Our role: Equipment and platform supply · Delivered 2021

Delivered in 2021. Restrooms sit along the visitor route. About 10 restrooms and 120 stalls first, then about 14 more. Occupancy, air, footfall, entrance guidance and deodorising share one platform; visitors can see nearby free stalls on a phone.

Restrooms at Xiezhou Guandi Temple sit along the visitor route, and holiday traffic arrives all at once. Cleaners learn a room is full or smelly only by walking there, and visitors learn there is no free stall only at the door.

Open the case

Public venue

Smart restrooms at Guangdong Science Center

Our role: Equipment and platform supply · Delivered 2024

Delivered in 2024. Seven restrooms and 152 stall sensors across exhibition floors first; one more later, with door-lock occupancy, an entrance guide screen and water metering.

Traffic through the galleries, cinemas and public areas at Guangdong Science Center is uneven. Study seasons and holidays can reach tens of thousands of visitors in a day, and restrooms sit on several floors. Cleaners learn a room is full or smelly only at the door.

Open the case

Expressway service area

Smart restroom operations across expressway service areas for Guangdong Communications Investment

Our role: Equipment and platform supply · Delivered 2024

Delivered in 2024. Five service areas built to the same pattern. One site has 220 stall sensors, 2 hosts and 6 guide screens of 43 inches; about 1,100 stall sensors across five.

Guangdong Communications Investment's service areas sit far apart along the expressway, and holiday traffic arrives at once. One site has many stalls; cleaners learn it is full only at the door. Headquarters needs occupancy, odour, footfall and water across several sites, without posting someone at each.

Open the case

Healthcare

A provincial-capital central hospital (confidential)

Our role: Equipment and platform supply · Delivered 2023

Delivered in 2023. Two phases of hospital restrooms: 75 ceiling stall sensors and 7 management hosts. Corridor smoking alerts and cleaner check-ins share one operations view.

At this central hospital, peak-hour stall vacancy is unclear, and cleaners learn a room is busy only at the door. Corridor no-smoking rules depend on patrols, cleaning attendance is unrecorded, and facilities staff need restrooms, smoking alerts and cleaning on one screen.

Open the case

Customer sectors

Sectors our projects cover

Specific names and logos require written authorisation, so only sectors are listed here.

  • Airports and transport hubs
  • Healthcare
  • Public venues and municipal bodies
  • Scenic areas and parks
  • Rail transit and infrastructure
  • Commercial buildings and parks
  • Broadcasting
  • Power and telecom operations
  • Metallurgy and non-ferrous metals
  • Industrial manufacturing
  • Agriculture and aquaculture

Need a real project's point table, configuration list or acceptance approach? We can share anonymised material under confidentiality during evaluation.

Next step

See whether an existing configuration can be reused

If your site resembles one of these, validation is usually much faster because the device model and alarm policy can be reused.